Discover a whole new degree of kitchen customization with our proven idea-through-installation model. Learn more
PartsTown imp33648-115 ICVG fan with 16" long lead wires measures 3.4" by 3.3" by 3.4" and weighs 0.7 pounds. Engineers will appreciate that the compact fan fits standard mounts and the extended leads simplify installation and maintenance.

Bon Chef 5094DPWHT 3.5 Qt. Chafer Food Pan
$188.59/ Each

T&S Brass B-7212-U01XS1E Hose Reel Assembly open 3/8"
$1,703.84/ Each

John Boos PBMS2820-12 32-5/8"W x 23-3/8"D x 16"H 16/300 Stainless Steel Construction Mop Sink
$963.57/ Each

Channel AXD2830 Lifetime Tough Bun Pan Rack
$1,066.77/ Each

CAC China BHM-B4 25 Oz. Bone White Porcelain Round Bahamas Bowl (4 Dozen Per Case)
$83.12/ Each

Merrychef USA DX0254 Non-Stick Tray Liner
$7.00/ Each

Traulsen RHT332WUT-FHS Spec-Line Refrigerator Reach-In Three-Section 79.0 cu. ft.
$34,386.66/ Each

Cleveland KDL40SH 40 Gallon Full Steam Jacket Design Steam Jacketed Kettle
$15,848.80/ Each

Advance Tabco FMSLAG-306-X 72"W x 30"D Stainless Steel Top Galvanized Adjustable Undershelf Work Table
$1,006.14/ Each

Winco FBM-443S Stainless Steel Square Mini Fry Basket
$7.48/ Each

50599401 THERMOSTAT,HEATER SAFETY
$268.26/ Each

NS-024-06 NUT
$12.39/ Each

1177790 SWITCH, ON/ON, DPDT
$87.74/ Each

13422S OVERLOAD PROTECTOR
$46.22/ Each

A039-11140 CASTER ASSEMBLY (SET OF FOUR)
$267.93/ Each

1650BP60 BLUE HOSE, 1/2 DIA, 60 L
$342.50/ Each

000009121 KIT-BITRON WATER VALVE 230V/1.77
$216.03/ Each

00-414805-00001 IGNITOR,LT HD
$108.02/ Each

3234746 CATCH,PULL-DOWN,6000
$7.35/ Each

2200602 24IN THERMOCOUPLE
$74.24/ Each

00-420786-00001 VALVE,DUAL PILOT
$97.31/ Each

34258-0 SPRING CARRIAGE TENSION--(1-5
$267.65/ Each

09-7230 MOTOR 2 SPEED 1/4HP 240 50/6
$1,365.45/ Each

E-4-3-162 CONTROL,LAE AT2
$116.06/ Each

218P145 COVER, LEG-BUMPER PK
$17.48/ Each